5609

5609
Upto 21-09-2025 – Goods – Schedule 1 – GST @ 5%
GST
Products of coir
 
*************
Notes:
As inserted by notification no. 43/2017 dated 14-11-2017 w.e.f. 15-11-2017
Schedules

= = = = = = = =

Plain text (Extract) only
For full text:-Visit the Source

= = = = = = = =

Leave a Reply